CA to Perform Engineering Inspection of the Lake Elkhorn Dam

Lake water levels will temporarily be lowered

The Columbia Association (CA) will lower the water level of Lake Elkhorn to perform an engineering inspection of the dam spillway weir, the concrete portion of the dam that the water flows over on a daily basis, in March. The purpose of this inspection is to evaluate existing conditions for future dam renovations to stabilize the concrete spillway. The water level drawdown process will take approximately four to six days, and CA anticipates that sections of shoreline and lake bottom may be exposed for a short period of time. The inspection will take less than one day and, once completed, the lake water levels will begin to revert to normal. If you have any questions, please call CA’s Open Space Management Office at 410-312-6330.

#  #  #

For media inquiries, contact:

Kelly Cooper
410-715-3104 

kelly.cooper@columbiaassociation.org

10221 Wincopin Circle, Columbia, Maryland 21044
ColumbiaAssociation.org
Facebook.com/CA.ColumbiaAssociation
Twitter.com/CA_InTheNews
YouTube.com/CATVChannel

Advertisements

Leave a comment

Filed under Columbia Association Press Releases

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s